Glulam house PH-242

Homes built from glulam

timber — from blueprint to keys in six months

PH-2422,600 sq ft

2 floors · 4 bedrooms · double height

$1,290,000turnkey, with utilities

View project
01 / 04
Find a project by size and budget

Project catalog

Which house is yours?

All projects (26)
Found: 6
  • PH-86

    86 m² · 1 floor · 2 bedrooms

    $342,000house kit

    View project
  • Bestseller

    PH-160

    160 m² · 1 floor · 3 bedrooms

    $735,000turnkey

    View project
  • PH-242

    242 m² · 2 floors · 4 bedrooms

    $1,290,000turnkey

    View project
  • Sauna house

    GH-64

    64 m² · 1 floor · sauna + guest room

    $244,000turnkey

    View project
  • PH-198

    198 m² · 2 floors · 4 bedrooms

    $1,035,000turnkey

    View project
  • New

    BH-138

    138 m² · 1 floor · 3 bedrooms

    $649,000turnkey

    View project

Pricing

Price your house in a minute

The price is fixed in the contract and does not grow during construction. The calculator uses this season's prices.

Package
Foundation
Roof
Estimated cost

$724,800

Per m²
$4,530
Term
25 wk
  • Turnkey672,000
  • Screw piles24,000
  • Asphalt shingles28,800

An exact quote after a free site visit.

Technology

Timber that does not shrink or crack

Glulam is not a log. Five kiln-dried lamellas glued with opposing grain: geometry that lasts decades and moving in without a year of settling.

  1. 5lamellas per sectionGlued with opposing grain — the beam does not warp or twist.
  2. 12%factory moistureKiln drying: the house does not settle or crack.
  3. <1%shrinkage in year oneWe start finishing right away, no year of waiting.
  4. ×1.7warmer than a logA tight tongue-and-groove joint with insulation inside.
  5. 6 mofrom blueprint to keysThe kit is made at the plant while the foundation is poured.

How we build

Seven stages from plot to keys

24 wkturnkey on average

  1. 01

    Design and estimate

    2 weeks

    We fit the project to your plot, calculate loads and fix the price in the contract. It does not change after that.

  2. 02

    Foundation

    3 weeks

    Soil survey, layout, piles or a slab. While the concrete cures, the plant cuts your house kit.

  3. 03

    House kit

    4 weeks

    Timber is CNC-cut to the project with millimetre precision, numbered and delivered wrapped in film.

  4. 04

    Wall assembly

    3 weeks

    The timber goes together like a kit: tongue into groove, insulation in the joint, dowels every five feet.

  5. 05

    Roof and windows

    4 weeks

    Rafters, insulation, standing seam or shingles. Panoramic windows sit on sliding supports for settling.

  6. 06

    Utilities and finishing

    8 weeks

    Wiring in conduit, underfloor heating, plumbing, sanding and hardwax oil. A photo report every week.

  7. 07

    Keys

    one day

    We hand over by an acceptance act with the house passport and a 10-year structural warranty.

Built homes

People already live in them

0
homes delivered
0
years building with glulam
0
regions
0 $
over the contract price
  • Lake Ladoga shore
    Lake Ladoga shore2025 · 212 m²PH-212
  • Istra, Moscow region
    Istra, Moscow region2024 · 138 m²BH-138
  • Valdai Hills
    Valdai Hills2025 · 176 m²PH-176
  • Sortavala, Karelia
    Sortavala, Karelia2023 · 242 m²PH-242
PH-198

Reviews

In the words of those who live there

We moved in in October, and by January we understood the main thing: at minus thirty the house is quiet and warm, and it smells of wood, not paint. Not a cent over the estimate.

Andrew and Maryliving here 3 years · Priozersk

Questions

What people usually ask

Didn't find an answer?

An engineer replies in the messenger within 15 minutes during working hours.

Ask an engineer
  • Under 1% in the first year — versus 5–8% for green logs. So windows, doors and finishing go in right away, not a year later.

Discuss a house

Your house by the water — this autumn

Leave your phone: an engineer will call back, match a project to your plot and budget and invite you to tour a finished home.

By pressing the button you agree to the processing of personal data.